Which trailer is used to transport construction machinery?

Last updated:

Short Answer — Construction Machinery Transport

For transporting construction machinery, the trailer is chosen according to the machine's transport height, operating weight and type of undercarriage. Light, low machines are carried on a flatbed with ramps or a semi-lowbed trailer; tall and heavy excavators and dozers need a lowbed trailer. The aim is to keep the total height including the load below the 4.00 m limit and to distribute the axle loads evenly.

Which measurements determine the choice of trailer?

Three pieces of information are needed to find the right trailer: the machine's height in transport position, its actual operating weight including attachments, and its widest point. Article 128 of the Road Traffic Regulation (Karayolları Trafik Yönetmeliği) sets limits of 2.55 m width and 4.00 m height including the load; for combinations with five or more axles, the total weight is limited to 40 tonnes. An indivisible load exceeding any of these dimensions may only go on the road with a special permit from KGM (General Directorate of Highways). All the limit values are listed in the entry legal road dimension limits.

The weight in the catalogue is often given with a standard bucket and boom. A hydraulic breaker, a long boom, additional counterweight or mud built up on the tracks can make a difference of several tonnes. The dimensions and weight should therefore be stated as the machine will be loaded.

Which trailer suits which machine?

MachineTypical trailerPoint to watch
Mini excavator, backhoe loader, forkliftFlatbed with ramps or semi-lowbedRamp gradient, tyre and track slippage
20–30 tonne tracked excavatorSemi-lowbed or well-deck lowbedHeight of the folded arm and cab
DozerLowbedBlade width exceeds 2.55 m on most models; the blade can be carried separately
Grader, rollerSemi-lowbed or lowbedLength and front-rear overhang on a grader
Excavator over 40 tonnes, crawler crane baseMulti-axle lowbed with detachable gooseneckCounterweight and boom on a separate vehicle
Long-boom drill rig, piling rigExtendable lowbedMarking of the rear overhang

The choice often comes down to a few centimetres. A dozer with a transport height of 3.15 m rises to 4.05 m on a semi-lowbed with a 0.90 m deck and exceeds the limit. The same machine stays at 3.85 m on a lowbed trailer with a 0.70 m well. For lighter and lower machines, on the other hand, a semi-lowbed is both easier to find and more economical.

How is a machine loaded onto the trailer?

  1. Ground and ramp check: The trailer stands on level, firm ground, and the ramps are set at an angle suited to the machine's climbing ability. Mud, oil and ice are cleaned off the ramps and deck.
  2. Driving on under its own power: The operator drives up at low speed in a straight line, guided by a banksman from below. No steering corrections or slewing of the upper structure are made on the ramp.
  3. Positioning: The machine's centre of gravity is placed relative to the axle group; a load shifted forward or backward overloads a single axle even if the total weight is within limits.
  4. Securing the arm and bucket: The arm is folded, the bucket is lowered onto the deck and supported with chocks. The upper structure swing lock is engaged, the parking brake is applied and hydraulic pressure is released.
  5. Lashing: The machine is chained in at least four directions from the lashing points indicated by the manufacturer. Removed buckets, blades and attachments are secured separately. The required force is found with a lashing calculation according to EN 12195-1.
  6. Final measurement: After loading is complete, the highest point on the cab, exhaust, beacon and arm is measured again. The actual dimension is compared with the dimension in the permit.

Who is responsible for what?

The shipper provides the correct dimension and weight information for the machine and a document showing the lashing points. The carrier provides a suitable trailer, lashing equipment and the necessary permits. The machine is usually driven onto the trailer by the shipper's operator; the division of roles during loading should therefore be agreed in writing in advance.

Common mistakes

  • Relying on the catalogue weight and not accounting for a breaker or additional counterweight.
  • Leaving the bucket raised, or carrying material inside the bucket.
  • Setting off without cleaning the mud off the tracks; falling mud creates both a weight and a traffic risk.
  • Declaring the height based on a pre-loading estimate, so that the permit dimension and the actual dimension do not match.

How does Voltim Global support you?

For construction machinery shipments, Voltim Global handles trailer selection, the lashing arrangement and oversize and heavy load permits in a single plan. On the Voronezh–Mersin shipment, it obtained the KGM special permit in 1 day.

Frequently Asked Questions

Is a wheeled mobile crane loaded onto a trailer?
Most mobile cranes travel on the road on their own axles and are not loaded onto a trailer. If the axle load or total weight exceeds the legal limit, a permit is obtained from KGM for the crane. Counterweights, hook blocks and some boom sections are carried on a separate truck or lowbed. Large crawler cranes are dismantled and shipped on several vehicles.
What if the machine cannot be loaded under its own power?
A broken-down machine, or one with its engine removed, is placed on the deck by lifting it with a crane or by pulling it with the winch in the trailer's gooseneck. If it is to be lifted, the machine's weight, lifting points and crane capacity are calculated in advance. Whatever the loading method, the final dimension on the trailer must match the dimensions in the permit if a KGM special permit has been obtained.
Can a dozer be transported without removing the blade?
If the blade width exceeds 2.55 m, the dozer can be carried with its blade only under a special permit. If the blade is removed and carried on the same trailer or on a separate vehicle, the machine can stay within the legal dimensions. Which option is more economical is decided by comparing the dismantling and reassembly time with the cost of the permit and escort.