Road freight rates are determined by distance and route, the likelihood of the truck finding a return load at destination, season, fuel prices, motorway and bridge tolls, the cost of transit permits, the type of cargo (ADR, reefer, out-of-gauge) and the time spent loading, unloading or waiting at the border. The price reflects how many days the truck is tied up by the trip and the risk of it returning empty.
What does a freight rate actually pay for?
A full truckload (FTL) rate is the price of having a tractor unit, trailer and driver dedicated to you for a certain period. Carriers think in truck-days rather than kilometres: how many days will loading, the road, the border, customs and unloading take in total, and where will the truck find its next load afterwards? That is why the price of a truck going from Istanbul to Munich is not the same as that of a truck returning from Munich to Istanbul. The general flow of the process is explained in the international road transport entry.
The main factors that set the price
| Factor | Effect on price | Example |
|---|---|---|
| Distance and route | Fuel, tyres, driver days | Choosing between the Balkan road route and RoRo via Italy |
| Return load | The risk of an empty return is added to the price | A truck going to a region with little outbound cargo is expensive |
| Season | Balance between demand and truck supply | Year end, the run-up to public holidays, harvest season |
| Fuel | The largest variable cost | Fuel adjustment clause in long-term agreements |
| Tolls | Vary by country and vehicle class | Maut in Germany, bridge and tunnel tolls |
| Permits | Permits with tight quotas raise the cost | Bilateral, transit or CEMT permit |
| Cargo type | Differences in equipment, documents and route | ADR, reefer, out-of-gauge, high-value cargo |
| Waiting | Charged once free time is exceeded | Loading, unloading, border queue |
How do tolls enter the calculation?
In Europe, motorway tolls are now mostly charged per kilometre and vary with vehicle weight, number of axles, Euro emission class and CO₂ class. In December 2023 Germany added a component of 200 euros per tonne of CO₂ to its toll; since July 2024 vehicles over 3.5 tonnes have also been subject to it. Under the December 2023 tariff, a Euro 6 truck over 18 tonnes with five or more axles pays about 35 euro cents per kilometre; on toll roads, a 1,000 km German leg alone means around 350 euros in road charges. As tariffs are updated periodically, the rate valid at the time of quotation applies. How tolls work country by country is covered in the truck motorway tolls in Europe entry.
Why do permits and cargo type change the price?
Turkish-registered trucks need a bilateral road transport permit to enter or transit many countries. Where a country's quota is tight, few trucks hold permits for it, so rates on that lane rise; if no permit can be found, more expensive alternatives such as RoRo come into play. Cargo type also changes the cost. ADR cargo requires a trained driver, an equipped vehicle and a longer route that avoids certain tunnels. A reefer truck adds the fuel for its refrigeration unit and more expensive equipment to the price. Out-of-gauge cargo requires special permits, escorts and driving restricted to certain hours.
Waiting times and extra charges
- The quotation states free time for loading and unloading (for example 24 hours); once it is exceeded, a daily waiting charge applies.
- Ordinary border waiting is built into the price as an average. Extraordinary waits, such as strikes or system outages, are handled separately in most agreements.
- A delivery that runs into a weekend driving ban ties the truck up for an extra day or two.
- A truck selected for physical inspection at customs may incur waiting and warehouse costs.
What can be done to lower the freight rate?
- Give the loading date as a window of a few days. This makes it easier for the carrier to use a truck returning to the region.
- Keep loading and unloading appointments firm and reduce the risk of waiting.
- Prepare pallets so they are stackable; in part loads this directly reduces the chargeable ldm.
- Provide dimensions, weight, cargo type and addresses in full in the quotation request. The list is in the information needed for a road freight quote entry.